Buying guide
Buying and building in Lefkada
Additional purchase costs
Updated November 2026. This information is only a guideline and cannot be guaranteed: ask your lawyer and the notary for a written quote.
- Transfer tax: 3.09% of the price or of the tax value of the property, whichever is higher
- Notary's fee: about 1% of the property value + 24% VAT
- Lawyer's fee: about 1% of the property value + 24% VAT (agreed in writing with your lawyer)
- Land registry (Hellenic Cadastre): about 0.5% of the property value
- Estate agent's fee: 3% of the purchase price + 24% VAT
A new building can be sold with 24% VAT instead of the transfer tax; this VAT is suspended until 31 December 2026, and a further extension has been announced but is not yet law.
Announced for 2027: the Greek government plans a transfer tax of 15% (instead of 3.09%) for buyers from outside the EU and the EEA, for purchases completed from 1 July 2027. A bill is before Parliament; its final scope is not settled. Ask us about the timing of your purchase.
Building in Greece
The market is saturated with resale houses, but what if you want a unique project? You want to build your dream house, fully matching your criteria without compromises. You desire something different, and you want to decide on your own decoration, layout and landscaping.
Building a house can be complicated or straightforward, no matter where you are in the world. Many people, especially in a foreign country, may feel hesitant about building. This hesitation often stems from a lack of experience, difficulty visualising a house from plans, concerns about costs, and legal issues.
However, building in Greece is relatively simple, nearly risk-free and, most importantly, affordable, provided you have the right advisor by your side. Building your property should be an exciting and joyful experience. It won't be a passive process, as all decisions will be made by you, shaping the look and feel of your home.
1. Find a suitable plot
Residential land is generally divided into two categories in terms of building. The first (easiest) category is land within the city or village plan, where you can build on a small plot and don't need clearance from the forestry service. In these areas there are no particular structural restrictions on residential construction, except that the building has to be positioned either on the border of the plot (but in this case no windows are allowed) or at least 2.5 metres from the borders.
The second category is land located outside the city plan. The basic rule is that you need at least 4,000 m² of land and the construction must be at least 15 metres from the borders. A 4,000 m² plot has a 186 m² allowance for a house.
The plot must also have frontage on a road that is legally recognised by the State: the Council of State has ruled that a private or unofficial road is not enough, and many rural roads are not recognised yet. Smaller plots that qualified under the old exceptions (from 2,000 m² for older plots) can only be built on if the building permit or pre-approval is applied for by 30 June 2027 (Law 5306/2026, the new Planning Code). This point alone decides whether a plot is buildable, so it is the first thing we check with an engineer.
There are ways to expand the allowance legally, for example by building an ecological house with a photovoltaic system providing electricity, or by building in stone. The square metres of stone buildings are counted from inside the walls, which gives a higher building allowance than a brick building (the size of a building is counted from the exterior walls according to Greek law), because a 50 cm thick solid stone wall takes more footprint. You can also combine stone and brick: it has a nice effect and the stone part gives additional square metres, although limited.
If the land has a slope, there is a way to build encaved, integrating the building in the landscape with less impact on the terrain. This also gives additional building square metres.
The construction density on the plots does not include basements, balconies and terraces, so make sure your plans include plenty of exterior (covered and uncovered) spaces, as you will live more outside than inside. In all cases, if the plot is outside the village boundaries, it is essential to have the clearance from the Forestry Authority confirming that the plot is not designated as forestry. Simply because the land has no trees on it does not mean it is not affected (certain rock formations, for example, may also be considered forestry).
To complicate matters further, the rules are different and can vary from one zone to another. Planning laws are very complicated and all sellers will claim that you can build on their land.
As a rule, all plots must have a new topographic plan with recent GPS coordinates, recognised road access if outside the town plan, a clearance from the forestry department if located outside the village boundaries, a clearance for the "water line" for a seaside plot (the law requires the building to be at a minimum distance from the sea), and a clearance from the archaeological service in certain areas. The plot must be free of debts and have clean titles.
In any case, the ability of the plot to be built on should be confirmed with an engineer, and a lawyer should confirm there are no legal issues.
2. Planning and approval: the building permit
Once you have found your plot, a local engineer has to be contacted to draw up plans and submit the building application. Alternatively, a draft by a non-Greek architect can be "translated" into Greek law (earthquake-proofing, ceiling heights, concrete columns etc.). In any case, you need a local architect to submit the planning application.
As in your own country, you will discuss the design of your house and your ideas in close collaboration with the architect. You give him your requirements, the size and the layout, and, complying with Greek law, he designs your house. The architect will be your local partner and coordinate all stakeholders (planners, government agencies, contractors, structural, fire safety, energy efficiency, plumbing and electrical design, etc.) on your behalf. Keep in mind that you will not be on site regularly during construction, so someone must be your "eyes on the ground". The entire building process will be followed, and you will be kept updated on the progress of the building with regular photos and emails.
Once the final plans have been agreed with the engineer, he submits your full file for approval and issuance of the permit. The estimated time for a building permit is 6 to 8 months; it is issued through the electronic system e-Adeies.
A building permit is required for new construction, for adding onto existing structures, and for renovations. The new construction is inspected during construction and after completion to ensure compliance with national, regional and local building codes. Failure to obtain a permit can result in significant fines and penalties, and even demolition of unauthorised construction if it cannot be made to meet the code.
The building permit is valid for 4 years, extendable for another 4 years.
3. The construction costs
Once you have approved the plans, we take the measurements and technical details from your engineer in order to give you an exact cost for the building. The construction costs are fully detailed, with a complete list of works and a timetable of works and payments.
The key factors in the cost: is it a stone or brick house? Does a steep plot need retaining walls? Is access to the house easy, or does it need concrete? Are electricity and water nearby? Are you happy with the standards offered by the builder? How much landscaping does the plot need? All of these matter, but at the moment the approximate cost is between €2,500 and €2,700 per m².
This price includes the building permit, 24% VAT and the social security contributions for the workers (e-EFKA, formerly IKA).
So what are these contributions? The social security office calculates how many man-hours it took to build your house, and you pay for that number of days. Even if you were to build the house yourself, you would still have to pay. Only after they have been paid in full can you ask for your house to be connected to the electricity network, which normally takes a couple of months. Until then you only have minimal construction power.
How we work with you
- You are looking for your dream home
- We arrange a meeting
- We meet you
- We look at properties matching your wishes
- We check the legal standing of the property
- We prepare all the papers for the transaction
- You get the keys
Frequently asked questions
What are the additional costs when buying property in Greece?
As a guide (November 2026): transfer tax 3.09% of the price or tax value, whichever is higher; notary about 1% + 24% VAT; lawyer about 1% + 24% VAT; land registry (Cadastre) about 0.5%; estate agent's fee 3% + 24% VAT. A 15% transfer tax for buyers from outside the EU and the EEA is announced for purchases completed from 1 July 2027 (bill before Parliament).
Can I build a house on land in Lefkada, Greece?
Yes. Land within the city or village plan allows building on smaller plots. Land outside the city plan requires at least 4,000 m² and frontage on a road legally recognised by the State, with the building at least 15 metres from the boundaries; a 4,000 m² plot allows a house of up to 186 m². Smaller plots under the old exceptions can be built only if the permit is applied for by 30 June 2027. Stone construction, ecological features and sloped terrain can increase the allowance.
How long does it take to get a building permit in Greece?
The estimated time for building permit issuance is 6 to 8 months. The permit is valid for 4 years and can be extended for another 4 years.
How much does it cost to build a house in Lefkada?
Construction costs are approximately €2,500 to €2,700 per m². This price includes the building permit, 24% VAT and the workers' social security contributions (e-EFKA). Costs vary with stone or brick construction, terrain slope, access roads and proximity to utilities.
What legal checks are needed before buying land in Lefkada?
Essential checks include: frontage on a legally recognised road (for plots outside the town plan), a new topographic plan with GPS coordinates, clearance from the Forestry Authority (for plots outside village boundaries), water line clearance for seaside plots, clearance from the archaeological service in certain areas, and verification that the land is free of debts with clean titles registered at the Cadastre.